Unused Production/Gas Lift Flowline
0011293 – 3″ x 5800m Unused Production/Gas Lift Flowline. See below for specification.
Details
0011293 – 3″ x 5800m Unused Production/Gas Lift Flowline
Inside Diameter 76.2mm. Design Pressure 345 bar. Max Fluid Temp 120degC. Water Depth 300m. Conveyed Fluid oil/water/gas. Designed for Sweet Service.
Location: UK